Seaworthy’s
most experienced personnel often act as owner’s representatives
throughout the conceptual, preliminary and detail design phases
of a project. We have the experience to review RFPs, plans,
contracts and specifications; provide assistance in conflict
resolution; and perform site supervision. Representative projects
have included such services for Casco Bay Lines during the
construction of their 399 passenger ferry; Northeast Utilities
during the construction of their 40,000 BBL double hull tank
barge, and to NOAA for their Fleet
|
|
Rehabilitation and Modernization (FRAM)Program. We have
also been similarly responsible for jumboizings, re-powerings,
reflaggings and other major ship modification work. Our
staff, for example, supervised rip-out, fit-up
and commissioning of new 1000 KW SSDG diesel engines for
a class of large containerships without taking them out
of service. Seaworthy also has supplied turnkey shipboard
fuel oil treatment and conditioning systems for diesel,
steam and gas turbine-powered ships.
|